Key takeaways

  • Bitcoin miners sell computing power (hashrate) to secure the network and are paid in newly issued bitcoin plus transaction fees; their margin depends on bitcoin’s price, network competition and the cost of electricity.
  • The April 2024 halving cut the block subsidy from 6.25 to 3.125 BTC, halving the main revenue line overnight for every miner.
  • After the October 29, 2026 difficulty adjustment, Hashrate Index put hashprice at about $34 per PH/s per day and network hashrate at about 1,062 EH/s, while fees were only 0.70% of block rewards in the week to September 28, 2026.
  • CoinShares estimated listed miners’ weighted average cash cost at about $75,500 per bitcoin in Q2 2026, putting the sector near or below cash breakeven, which helps explain the shift toward AI hosting.

How bitcoin mining makes money

Bitcoin mining is the process of competing to add the next block of transactions to the blockchain. Specialized machines called ASICs (application-specific integrated circuits) run trillions of guesses per second. The miner that finds a valid answer earns the block reward: a fixed subsidy of newly created bitcoin plus the fees attached to the transactions in that block. A new block arrives about every ten minutes, or roughly 144 per day.

Four terms drive the economics:

  • Hashrate. The total computing power on the network, measured in exahashes per second (EH/s). A miner’s share of total hashrate is, on average, its share of rewards.
  • Difficulty. A setting that the protocol adjusts every 2,016 blocks (about two weeks) so blocks keep arriving every ten minutes. When more machines join, difficulty rises and each machine earns less.
  • Hashprice. The expected daily revenue from one unit of hashrate, usually quoted in dollars per petahash per second per day ($/PH/s/day). It combines bitcoin’s price, difficulty, the subsidy and fees into one number.
  • Efficiency. How much energy a machine uses per unit of work, measured in joules per terahash (J/TH). Lower is better, because electricity is the largest operating cost.

The April 2024 halving and today’s numbers

Bitcoin’s code halves the block subsidy every 210,000 blocks, roughly every four years. The fourth halving took place at block 840,000 on April 19, 2024 (UTC evening, April 20 in some time zones), cutting the subsidy from 6.25 to 3.125 BTC. Network issuance fell from about 900 to about 450 new bitcoin per day. The next halving is expected around 2028.

Fees have not filled the gap. Hashrate Index data for the week to September 28, 2026 showed fees at 0.70% of total block rewards, so miners remain almost entirely dependent on the subsidy and on bitcoin’s price. A Hashrate Index update on October 30, 2026 reported:

  • Hashprice of about $34/PH/s/day after the October 29, 2026 difficulty adjustment, down from $39.87 on September 28.
  • Network hashrate of about 1,062 EH/s (average for the difficulty epoch ending October 29, 2026), back above 1,000 EH/s since October 11.
  • Difficulty of 148.36 trillion, after a 5.54% increase on October 29, 2026, about 5% below the record.
  • A forward curve locking in an average hashprice of about $32.88 through March 2027.

For context, CoinShares reported that hashprice hit an all-time low of $27.7/PH/s/day in June 2026 before recovering as bitcoin rebounded.

Fleet efficiency and cost per coin

Because every machine earns the same hashprice, profitability comes down to how much electricity it burns to earn it. Hashrate Index translates hashprice into revenue per megawatt-hour of power consumed, by efficiency tier:

Machine efficiencyRevenue per MWh consumedApprox. gross revenue per MW per year
Under 14 J/TH$138$1.21 million
14 to 19 J/TH$100$0.88 million
19 to 25 J/TH$75$0.66 million
25 to 38 J/TH$52$0.46 million

Revenue per MWh is from Hashrate Index as of September 28, 2026; the annual figures multiply by 8,760 hours and assume full uptime. A miner paying $50/MWh for power is comfortably profitable on new machines but loses money on older ones, which is why fleets are constantly replaced.

The same logic gives an approximate electricity cost per coin. At the September 28 BTC-denominated hashprice (about 0.000477 BTC per PH/s per day), a fleet averaging 20 J/TH uses roughly 1,000 MWh of power for every bitcoin it mines. At $40/MWh that is about $40,000 of electricity per coin, before staff, hosting, depreciation and financing. These are BlockWest estimates for illustration.

Reported figures vary widely. Riot Platforms reported a cost to mine of $49,912 per bitcoin in Q2 2026, excluding depreciation. CoinShares put the listed-miner weighted average cash cost at about $75,500 per bitcoin in Q2 2026, with all-in costs ranging from about $76,500 to more than $350,000 per coin depending on company and how much capital is being spent on AI build-outs.

Power contracts and curtailment

Most large miners buy power under long-term contracts, some with fixed prices and some indexed to wholesale markets. Many sit in grids such as ERCOT in Texas, where they can earn money by switching off. Curtailment means pausing machines during price spikes or grid stress, either to resell contracted power at high prices or to collect payments for participating in demand response programs.

This flexibility is valuable. Riot reported $10.1 million of power curtailment credits in Q2 2026 from pausing operations under ERCOT’s demand response programs. Grid operators view miners as an interruptible load, which can help win interconnection approvals, though it also draws scrutiny from regulators and local communities.

Why miners are pivoting to AI hosting

The assets that matter most for mining, large grid connections, cheap power, land and cooling, are the same ones AI data centers need. Long-term AI and high-performance computing (HPC) leases offer contracted, dollar-denominated revenue with no halving or hashprice exposure. CoinShares estimated AI hosting at about $1.5 million per MW per year against about $0.5 million for mining in its Q2 2026 report. IREN reported that its AI cloud revenue overtook mining revenue for the first time in that quarter.

BlockWest tracks the signed leases, tenants and contract values company by company in a separate research tracker on the miner pivot to AI hosting.

Risks to understand

  • Price and hashprice risk. Revenue moves with bitcoin’s price and falls as competitors add hashrate, while most costs are fixed.
  • Halving risk. The next subsidy cut, expected around 2028, will halve block rewards again unless price or fees rise.
  • Power risk. Contract expiries, rising tariffs, grid rule changes or curtailment limits can lift costs quickly.
  • Hardware obsolescence. Machines lose competitiveness within a few years, forcing continual capital spending.
  • Balance sheet and execution risk. Many miners fund fleets and AI build-outs with convertible debt and share sales, and AI conversions depend on tenants, construction timelines and financing.

This guide is educational and is not investment advice.

Sources and further reading

Frequently asked questions

What is hashprice?

Hashprice is the expected daily revenue from one unit of mining power, usually quoted in dollars per petahash per second per day. Hashrate Index put it at about $34/PH/s/day after the October 29, 2026 difficulty adjustment.

What did the April 2024 halving change for miners?

It cut the block subsidy from 6.25 to 3.125 BTC at block 840,000 on April 19, 2024, halving new bitcoin issuance to about 450 BTC per day. Unless bitcoin's price or fees rise to compensate, each unit of hashrate earns roughly half as much.

How much does it cost to mine one bitcoin?

It depends mainly on power prices and machine efficiency. CoinShares estimated listed miners' weighted average cash cost at about $75,500 per bitcoin in Q2 2026, while Riot reported $49,912 excluding depreciation for the same quarter.

Why are bitcoin miners moving into AI data centers?

Their grid connections, land and power contracts suit AI workloads, and long-term AI hosting leases pay steadier, higher revenue per megawatt with no halving or hashprice exposure. CoinShares estimated about $1.5 million per MW per year for AI against about $0.5 million for mining in Q2 2026.

This explainer is reviewed and updated as the rules and the market change. Last reviewed November 2, 2026. It is educational content and not financial, legal or tax advice.

Keep learning